India Bridges

Anji Khad Bridge (USBRL)

Indian Railways' first cable-stayed railway bridge, crossing the deep Anji river valley on the Katra–Banihal section of the USBRL.

Project at a glance

LocationReasi district, Jammu and Kashmir
Owner / agencyIndian Railways (Northern Railway); executed through Konkan Railway Corporation
Completed / opened2025
SectorBridges
Lengthabout 725 m
Pylon height193 m
Deck height above river bed331 m
Stay cables96

Construction technology used

  • Cable-stayed deck carried by 96 cables from a single 193 m main pylon.

Key facts

  • India's first cable-stayed railway bridge.
  • Opened with the USBRL on 6 June 2025.

Learn the engineering behind it

Sources

Facts on this page are taken only from official or authoritative sources (owner agencies, government releases, designers and contractors) and written in our own words. A figure is shown only when we could confirm it from at least two of the sources below; anything we could not confirm is left out. Spotted an error? Tell us.

Author: Indiacon. Last reviewed 24 Oct 2026. Educational summary; not an official project document.