Types of estimates

Basics Estimation and Quantity Surveying Reviewed 24 Oct 2026 2 min read

An estimate predicts what a piece of work will cost before it is built. Estimates get more detailed as design develops, and each stage uses a different method.

A preliminary or approximate estimate is made at the idea stage, using rates per square metre of plinth area, per cubic metre of building volume, per bed for a hospital, or per kilometre of road. It supports budgeting and approval in principle.

Diagram: Indiacon original, not to scale.

A detailed estimate follows the drawings. Each item, such as excavation, concrete, steel, brickwork, plaster and so on, is measured in the units of the measurement standard (IS 1200 in India), entered in a bill of quantities and multiplied by an analysed rate. Contingencies and work-charged establishment are added. Revised and supplementary estimates handle changes later.

Measurement is the backbone. Long wall and short wall, or centre-line methods, are used for walls and foundations; earthwork uses cross sections; steel comes from the bar bending schedule. Rates come from schedules of rates or a rate analysis of labour, material and plant.

Key formulas
  • Item amount = quantity × rate
  • Plinth-area estimate = plinth area × rate per m²
Solved example

Problem. A 120 m² house, plinth-area rate assumed for illustration at Rs 25 000 per m², with 5 % contingency. Find the approximate cost.

  1. 120 × 25 000 = Rs 30,00,000.
  2. Add 5 %: Rs 31,50,000.

Answer. About Rs 31.5 lakh (illustrative rate only)

Quick quiz

1Which estimate uses the full drawings?

Detailed estimate.

2Which Indian standard covers measurement?

IS 1200.

3Name one approximate method.

Plinth-area rate, cubic rate or service-unit rate.

Code note
  • IS 1200 (series) (India): Method of measurement of building and civil engineering works, one part per trade.
  • IS 2502 (India): Code of practice for bending and fixing of bars for concrete reinforcement.

Cited by number and clause only. We do not reproduce clause text, tables or figures (BIS Act 2016, s.10(5) and s.11). Check the current edition and amendments before use.

References and further reading

Standard texts, listed in no order of merit. We do not copy text, figures, tables or solved problems from any book; our explanations and examples are original.

  • B. N. Dutta, Estimating and Costing in Civil Engineering, UBS Publishers, latest edition.

Free and official sources

All references for this subject →

Found an error? Write to indiacongroupofengineers [at] gmail [dot] com. For corrections and feedback. We never ask for payment or personal details.