Pre-tensioning versus post-tensioning
Both methods put high-strength steel into tension and lock that tension into the concrete; they differ in when the steel is stressed. In pre-tensioning, strands are stretched between fixed abutments at a casting bed before the concrete is placed. The concrete is cast around them, cured, and once it reaches the required transfer strength the strands are cut. They try to shorten, grip the concrete by bond over a transfer length near each end, and put it into compression.
In post-tensioning, ducts are cast into the member. After the concrete has hardened, tendons are threaded through, stressed by hydraulic jacks reacting against the concrete itself, and locked off at anchorages. In bonded systems the ducts are then filled with grout, which protects the steel and bonds it to the concrete; in unbonded systems the tendons are greased and sheathed and can in principle be inspected or replaced.
Pre-tensioning suits factory production of many identical units: hollow-core planks, railway sleepers, poles and bridge girders of moderate span. Tendons are usually straight or deflected at a few points. Post-tensioning suits large, cast-in-place or segmental work: long-span box girders, slabs, tanks, containment structures and continuous bridges, where curved tendon profiles follow the moment diagram.
The two methods lose prestress in different ways. Pre-tensioned members lose stress through elastic shortening at transfer, then creep, shrinkage and relaxation. Post-tensioned members add friction along the duct and wedge draw-in at the anchorage, but elastic shortening affects only the tendons stressed earlier. IS 1343 covers design and construction of both.
Always compare measured elongation with the calculated value; a large mismatch signals friction, duct blockage or a gauge error.
Jack elongation (ignoring friction): Δ = P L / (A_p E_p) = f_p L / E_pPrestressing force P = f_p × A_p
Thinking elastic shortening loss applies in the same way to both methods; in post-tensioning it affects only previously stressed tendons.
Problem. A post-tensioned tendon of 12 strands, each 98.7 mm², is jacked to 1 395 MPa (0.75 of a 1 860 MPa strand). The tendon is 30 m long and E_p = 195 GPa. Find the jacking force and the elongation, ignoring friction.
- A_p = 12 × 98.7 = 1 184.4 mm².
- P = 1 395 × 1 184.4 = 1 652 238 N ≈ 1 652 kN.
- Δ = f_p L / E_p = 1 395 × 30 000 / 195 000 = 214.6 mm.
- On site the measured elongation is compared with the calculated value (with friction included) to confirm the force.
Answer. Jacking force about 1 652 kN; elongation about 215 mm
Quick quiz
1When are strands stressed in pre-tensioning?
Before the concrete is cast, against fixed abutments.
2Why grout bonded post-tensioning ducts?
To protect the steel from corrosion and bond it to the concrete.
3Which method suits factory-made railway sleepers?
Pre-tensioning.
- IS 1343 (India): Design and construction of prestressed concrete.
- IRC:112 (India): Code of practice for concrete road bridges.
- EN 1992 (Eurocode 2) (Europe): Design of concrete structures.
- ACI 318 (USA): Building code requirements for structural concrete.
Cited by number and clause only. We do not reproduce clause text, tables or figures (BIS Act 2016, s.10(5) and s.11). Check the current edition and amendments before use.
References and further reading
Standard texts, listed in no order of merit. We do not copy text, figures, tables or solved problems from any book; our explanations and examples are original.
- N. Krishna Raju, Prestressed Concrete, McGraw Hill Education (India), latest edition.
- T. Y. Lin, N. H. Burns, Design of Prestressed Concrete Structures, Wiley, 3rd edition.
- E. G. Nawy, Prestressed Concrete: A Fundamental Approach, Pearson, latest edition.