Points and crossings, together called a turnout, let a train move from one track to another. A turnout has three main parts. The switches are a pair of tapered, movable tongue rails that are set against one stock rail or the other to guide the wheels onto the chosen route. The lead rails curve the diverging route away from the main line. The crossing, or frog, is the point where the inner rails of the two routes cross, with a gap that the wheel flanges pass through.
At the crossing, the wheel briefly loses support from one rail, so check rails on the opposite side hold the wheelset in line and stop the flange from hitting the nose. Crossings are made of cast manganese steel or welded rails, and swing-nose crossings, which close the gap, are used on high-speed lines because they remove the impact.
Crossings are described by their number N, written as 1 in N: the ratio of the spread between the crossing legs to the length along the crossing. The larger the number, the flatter the angle and the larger the turnout radius, which allows a higher speed on the diverging route but makes the turnout longer. Common Indian turnouts are 1 in 8.5 and 1 in 12, with flatter ones for higher speed.
Turnouts are the most maintenance-intensive part of the track. Wear on switch tips and crossing noses, loose fastenings and poor ballast under the crossing must be inspected regularly. Interlocking with the signals ensures points are correctly set and locked before a train is allowed over them.
Inspect crossings as part of every track walk; impact damage there grows quickly.
Crossing angle (right-angle method): N = cot α, so α = arctan(1 / N)Larger N: flatter angle, larger radius, higher turnout speed, longer turnout
Treating the crossing number as an angle; it is a ratio, 1 in N.
Problem. Find the crossing angle for 1 in 8.5 and 1 in 12 crossings.
- 1 in 8.5: α = arctan(1 / 8.5) = arctan(0.1176) = 6.71°.
- 1 in 12: α = arctan(1 / 12) = arctan(0.0833) = 4.76°.
- The 1 in 12 turnout is flatter, so it allows a higher speed on the diverging route but takes more length.
Answer. About 6.71° for 1 in 8.5 and 4.76° for 1 in 12
Quick quiz
1What do the switches do?
Guide the wheels onto the chosen route by moving tongue rails against a stock rail.
2Why are check rails needed at a crossing?
To hold the wheelset in line while the wheel crosses the gap at the nose.
3What does a larger crossing number allow?
A higher speed on the diverging route.
- Indian Railways Permanent Way Manual (India): Standards and practice for track laying and maintenance.
- AREMA Manual for Railway Engineering (USA): North American railway engineering recommended practice.
Cited by number and clause only. We do not reproduce clause text, tables or figures (BIS Act 2016, s.10(5) and s.11). Check the current edition and amendments before use.
References and further reading
Standard texts, listed in no order of merit. We do not copy text, figures, tables or solved problems from any book; our explanations and examples are original.
- Satish Chandra, M. M. Agarwal, Railway Engineering, Oxford University Press, latest edition.
- C. Esveld, Modern Railway Track, MRT-Productions, 2nd edition.
Free and official sources