A–Z glossary
239 civil engineering terms in plain words.
A B C D E F G H I J L M N O P Q R S T U V W Y
A
- Abutment
- End support of a bridge or arch that holds back the approach fill and carries the span.
- Activated sludge
- Biological wastewater treatment in which aerated microbes break down organic matter and are settled and recycled.
- Admixture
- A chemical added in small doses to change fresh or hardened concrete, such as a plasticiser or retarder.
- Aggregate
- Sand, gravel or crushed stone that forms most of the volume of concrete and road layers.
- Air entrainment
- Deliberately adding tiny air bubbles to concrete to resist freeze-thaw damage.
- Allowable bearing pressure
- The pressure a foundation may apply, limited by both shear safety and settlement.
- Anchorage
- The device or bar length that transfers force from a tendon or bar into concrete.
- Apron
- Paved area at an airport where aircraft park, load and refuel.
- Aquifer
- A water-bearing layer of soil or rock that can yield useful quantities of groundwater.
- Arch
- A curved member that carries load mainly in compression to its supports.
- Atterberg limits
- Water contents marking changes in the behaviour of fine soil: liquid, plastic and shrinkage limits.
B
- Backsight
- In levelling, the first staff reading taken after setting up the instrument, on a point of known level.
- Backwashing
- Reversing flow through a filter to clean its media.
- Ballast
- Crushed stone under and around railway sleepers that spreads load and drains water.
- Bar bending schedule
- A table listing every reinforcing bar's shape, size, length and number.
- Barrage
- A low river structure with gates that raises water level for diversion into canals.
- Base course
- Pavement layer below the surface layers that spreads load to the sub-base.
- Base isolation
- Separating a building from ground shaking using flexible bearings.
- Beam
- A member that carries load mainly by bending.
- Bearing (bridge)
- A device that transfers load from deck to substructure while allowing controlled movement.
- Bearing capacity
- The pressure at which soil under a foundation fails in shear.
- Bench mark
- A fixed point of known reduced level used as a reference for levelling.
- Bending moment
- The internal turning effect at a section of a member.
- Berm
- A horizontal step in a slope or embankment.
- Bill of quantities
- A list of work items with their measured quantities, used for pricing and payment.
- BIM
- Building Information Modelling: shared digital models carrying geometry and data.
- Bitumen
- A black, sticky binder from petroleum refining used in asphalt roads.
- BOD
- Biochemical oxygen demand: oxygen used by microbes to break down organic matter, usually over 5 days at 20 °C.
- Bored pile
- A pile formed by drilling a hole and filling it with reinforcement and concrete.
- Box girder
- A hollow closed-section girder that is stiff in bending and twisting.
- Breakwater
- A structure that shelters a harbour from waves.
- Buckling
- Sudden sideways failure of a slender compression member.
- Bulking of sand
- Increase in volume of damp sand compared with dry sand.
- Buttress dam
- A dam with a sloping face supported by a series of buttresses.
C
- Caisson
- A hollow box or cylinder sunk into place to form a foundation or breakwater.
- Camber
- The slight cross slope of a road surface that sheds rainwater.
- Cantilever
- A member fixed at one end and free at the other.
- Capacity (traffic)
- The maximum flow a road or lane can carry under prevailing conditions.
- Cash flow
- The timing of money paid out and received over a project.
- CBR
- California Bearing Ratio: a penetration test that rates subgrade and granular material strength.
- Centroid
- The geometric centre of an area.
- Change point
- In levelling, a point with both a foresight and a backsight.
- Characteristic strength
- The strength below which only a small specified fraction of test results is expected to fall.
- Chlorination
- Disinfecting water by adding chlorine.
- Clash detection
- Automatic finding of conflicts between elements in combined BIM models.
- Coagulation
- Adding chemicals so fine particles in water clump together and settle.
- Cofferdam
- A temporary enclosure that keeps water out of a work area.
- Cohesion
- The part of soil shear strength that does not depend on normal stress.
- Column
- A vertical member carrying mainly compression.
- Compaction
- Pressing soil or concrete to remove air and increase density.
- Composite construction
- Steel and concrete connected to act together.
- Consolidation
- Slow settlement of saturated clay as water is squeezed out under load.
- Contingency
- An allowance in a budget or schedule for uncertain events.
- Contour
- A line joining points of equal elevation on a map.
- Corbel
- A short cantilever bracket projecting from a column or wall.
- Cost performance index
- Earned value divided by actual cost.
- Cover (concrete)
- The thickness of concrete between a bar and the nearest surface.
- CPM
- Critical path method for scheduling.
- Creep
- Slow growth of strain under a sustained load.
- Critical path
- The longest chain of dependent activities, which sets the project duration.
- Cross-drainage work
- A structure where a canal crosses a stream, such as an aqueduct or syphon.
- Culvert
- A small structure carrying water under a road or railway.
- Curing
- Keeping concrete moist and warm enough for cement to hydrate.
- Cut-and-cover
- Building a tunnel in an open trench and backfilling over it.
D
- Dead load
- The weight of the structure itself and permanent fixtures.
- Deflection
- Movement of a structural member under load.
- Delta
- In irrigation, the total depth of water a crop needs over its base period.
- Design-build
- A delivery model in which one party designs and builds.
- Development length
- The bar length needed to transfer its force into concrete by bond.
- Dewatering
- Lowering groundwater to allow dry excavation.
- Differential settlement
- Unequal settlement between parts of a structure.
- Disinfection
- Killing pathogens in water, usually with chlorine or UV.
- Dowel bar
- A smooth bar across a concrete pavement joint that transfers load while allowing movement.
- Dredging
- Removing sediment from the bed of a waterway.
- Drip irrigation
- Delivering water slowly to the root zone through emitters.
- Ductility
- Ability to deform well beyond yield without losing strength.
- Duty
- In irrigation, the area a unit discharge can irrigate over a base period.
E
- Earned value
- The budgeted cost of the work actually completed.
- Earth pressure
- Lateral pressure exerted by soil on a wall.
- Effective length
- Length of an equivalent pin-ended column with the same buckling load.
- Effective stress
- Total stress minus pore water pressure; it controls soil strength.
- Efflorescence
- White salt deposits on masonry surfaces.
- EIA
- Environmental Impact Assessment.
- Embankment
- A raised bank of compacted fill.
- Energy dissipator
- A structure below a spillway that destroys the energy of falling water.
- EPC
- Engineering, procurement and construction contract.
- Equilibrium
- State in which forces and moments on a body balance.
- Escalation
- Increase in prices over time allowed for in an estimate.
- Expansion joint
- A gap that lets a structure move with temperature.
- Extension of time
- Contractual extra time granted for delays the contractor is not responsible for.
F
- Factor of safety
- Ratio of capacity to demand.
- Falsework
- Temporary structure supporting formwork and fresh concrete.
- Fatigue
- Failure under many repeated loads below the static strength.
- FIDIC
- International federation of consulting engineers and its standard contract forms.
- Filter (geotechnical)
- A graded layer that lets water pass but holds soil particles back.
- Fineness modulus
- An index of the coarseness of an aggregate from sieve analysis.
- Flakiness index
- Share by mass of aggregate particles thinner than a set fraction of their size.
- Flexible pavement
- A pavement of bituminous and granular layers.
- Float
- Time an activity can slip without delaying the project.
- Flow net
- A grid of flow lines and equipotentials used to analyse seepage.
- Fly ash
- Fine ash from coal power stations used in cement and concrete.
- Footing
- A spread foundation under a column or wall.
- Foresight
- In levelling, a staff reading on a point whose level is wanted, the last before moving.
- Formation
- The prepared surface on which a road or rail structure is built.
- Formwork
- Temporary moulds that shape concrete until it hardens.
- Freeboard
- Height between maximum water level and the top of a dam or channel bank.
- Friction pile
- A pile that carries load mainly by friction along its shaft.
- Froude number
- Ratio of flow inertia to gravity; above 1 flow is supercritical.
G
- Gantt chart
- A bar chart showing activities against time.
- Gauge (railway)
- Distance between the inner faces of the rails.
- Geotextile
- A permeable fabric used to separate, filter or reinforce soil.
- GGBS
- Ground granulated blast-furnace slag, used as a cement replacement.
- Girder
- A main beam, usually large, carrying other members.
- GNSS
- Global navigation satellite systems used for positioning.
- Grade separation
- Separating crossing traffic streams at different levels.
- Gradient
- Slope expressed as a ratio or percentage.
- Gravity dam
- A dam that resists water pressure by its own weight.
- Grout
- A fluid mix of cement and water, sometimes with sand, used to fill voids.
- Gully trap
- A trap outside a building collecting waste water from kitchens and baths.
H
- Head (hydraulic)
- Energy of water per unit weight, expressed as a height.
- Honeycombing
- Voids in hardened concrete from poor compaction.
- Hydraulic jump
- Sudden rise in water level where fast shallow flow becomes slow deep flow.
- Hydraulic radius
- Flow area divided by wetted perimeter.
- Hydrograph
- A graph of river flow against time.
I
- Imposed load
- Load from occupancy, furniture and movable items.
- Infiltration
- Entry of rainwater into the soil.
- Influence line
- A graph of a response at one point as a unit load moves along a structure.
- Intake
- A structure that draws water from a source.
- Interchange
- A grade-separated junction with ramps.
- Invert
- The lowest inside level of a pipe or channel.
- Isolated footing
- A footing under a single column.
J
- Joint (rock)
- A natural fracture in rock without visible movement.
L
- Lap splice
- Overlapping two bars to transfer force between them.
- Levelling
- Measuring height differences between points.
- Lime
- Calcium oxide or hydroxide used in mortar and soil stabilisation.
- Limit state
- A condition beyond which a structure no longer meets a design requirement.
- Lining (canal)
- An impervious layer on a canal bed that cuts seepage.
- Lintel
- A beam over a door or window opening.
- Liquefaction
- Loss of strength of loose saturated sand during shaking.
- Live load
- Common name for imposed load.
- Load path
- The route by which loads travel through a structure to the ground.
- Longitudinal section
- A profile along the centre line of a road, railway or pipe.
M
- Manning's n
- Roughness coefficient in the Manning equation.
- Mass-haul diagram
- A plot of cumulative earthwork volume along a route.
- Modulus of elasticity
- Ratio of stress to strain in the elastic range.
- Moment distribution
- An iterative method for analysing indeterminate beams and frames.
- Moment of inertia
- Second moment of area; measures a section's bending stiffness.
N
- NATM
- New Austrian Tunnelling Method.
- Neutral axis
- The line in a bent section where strain is zero.
- Non-destructive testing
- Testing without damaging the structure, such as rebound hammer or ultrasonic tests.
O
- Overhead tank
- An elevated water tank providing pressure by gravity.
P
- Passenger car unit
- An equivalence factor converting vehicles to cars.
- Pavement
- The layered structure of a road, runway or yard.
- Penstock
- A pressure pipe carrying water to turbines.
- Permeability
- How easily water flows through soil or rock.
- PERT
- Program Evaluation and Review Technique.
- Pier
- An intermediate support of a bridge.
- Pile
- A long slender foundation member carrying load deep into the ground.
- Pile cap
- A block joining the heads of a pile group.
- Planned value
- Budgeted cost of work scheduled up to a date.
- Plinth
- The part of a building between ground and floor level.
- Plumbing stack
- A vertical drainage pipe collecting waste from floors.
- Poisson's ratio
- Ratio of lateral to axial strain.
- Pore water pressure
- Pressure of water in the voids of soil.
- Portal frame
- A rigid frame of columns and rafters, common in sheds.
- Post-tensioning
- Stressing tendons after concrete hardens.
- Pozzolana
- A material that reacts with lime to form cementing compounds.
- Pre-tensioning
- Stressing strands before concrete is cast around them.
- Precast
- Concrete cast away from its final position and then installed.
- Prestress loss
- Reduction in prestress force over time.
- Prime coat
- Low-viscosity bitumen sprayed on a granular base before asphalt.
- Prismoidal formula
- An earthwork volume formula exact for prismoids.
- Punching shear
- Shear failure of a slab around a concentrated load or column.
Q
- Quantity surveying
- Measuring and valuing construction work.
R
- Radius of gyration
- √(I/A), a measure of a section's resistance to buckling.
- Raft foundation
- A single slab foundation under a whole building.
- Rapid sand filter
- A filter at high rate cleaned by backwashing.
- Rate analysis
- Breaking a unit of work into resources to price it.
- Rebound hammer
- A device estimating concrete surface hardness.
- Reduced level
- Height of a point above a datum.
- Reinforcement
- Steel bars or mesh embedded in concrete.
- Resource levelling
- Rescheduling activities within float to smooth resource demand.
- Retaining wall
- A wall that holds back soil.
- Rigid pavement
- A pavement with a concrete slab.
- Rip-rap
- Loose large stones protecting a slope from erosion.
- Risk register
- A record of project risks, ratings, owners and responses.
- Rock bolt
- A steel bar anchored in rock to support an excavation.
- RQD
- Rock quality designation, the share of core in sound pieces of at least 100 mm.
- Runoff
- Rainfall that flows over land to streams.
- Rutting
- Permanent depressions in wheel paths of a flexible pavement.
S
- Sanitary landfill
- An engineered site for disposing of waste with liners and cover.
- Schedule performance index
- Earned value divided by planned value.
- Section modulus
- I divided by the distance to the extreme fibre.
- Sedimentation
- Settling of suspended particles under gravity.
- Segregation
- Separation of coarse aggregate from mortar in fresh concrete.
- Seismic zone
- A region grouped by expected earthquake intensity.
- Septic tank
- A watertight tank that settles and partly digests household sewage.
- Service reservoir
- A tank balancing supply and demand in a distribution network.
- Settlement
- Downward movement of a foundation.
- Shear force
- The internal force at a section acting across it.
- Shear wall
- A wall designed to resist lateral forces.
- Shotcrete
- Sprayed concrete.
- Sight distance
- The length of road visible to a driver.
- Sleeper
- A beam under rails that holds gauge and spreads load.
- Slenderness ratio
- Effective length divided by radius of gyration.
- Slump
- Drop of fresh concrete in the slump test, a measure of workability.
- Soft storey
- A storey much less stiff than those above it.
- Spillway
- A structure that passes flood water safely past a dam.
- Standard penetration test
- A field test counting blows to drive a sampler 300 mm.
- Stilling basin
- A basin that contains a hydraulic jump below a spillway.
- Stirrup
- A bar loop resisting shear in a beam.
- Strain
- Change in length divided by original length.
- Stress
- Force per unit area.
- Subgrade
- The natural or fill soil at the bottom of a pavement.
- Superelevation
- Banking of a road on a curve.
- Surge tank
- A tank that absorbs pressure surges in a water conductor system.
T
- Tack coat
- A light bitumen coat bonding two asphalt layers.
- Tendon
- A prestressing steel element.
- Tie bar
- A deformed bar across a longitudinal pavement joint holding slabs together.
- Time of concentration
- Travel time of runoff from the farthest point to the outlet.
- Total station
- An instrument measuring angles and distances electronically.
- Trap
- A water-filled bend preventing sewer gas from entering a building.
- Traverse
- A series of connected survey lines with measured angles and lengths.
- Truss
- A framework of members joined in triangles.
- Tunnel boring machine
- A machine that excavates a tunnel by a rotating cutterhead.
- Turbidity
- Cloudiness of water from suspended particles.
U
- Unit hydrograph
- Runoff hydrograph from one unit of effective rain over a set duration.
- Uplift
- Upward water pressure under a dam or structure.
V
- Variation
- A change to the work instructed under a contract.
- Vent pipe
- A pipe that admits air to drainage and protects trap seals.
- Void ratio
- Volume of voids divided by volume of solids.
W
- Water hammer
- A pressure surge when flow in a pipe stops suddenly.
- Water-cement ratio
- Mass of water divided by mass of cement in a mix.
- Waterlogging
- Rise of the water table into the root zone.
- Weir
- A barrier over which water flows, used to raise level or measure flow.
- Well foundation
- A large caisson sunk to carry a bridge pier in a riverbed.
- Work breakdown structure
- Hierarchical breakdown of project scope into work packages.
- Workability
- Ease of placing and compacting fresh concrete.
Y
- Yield strength
- Stress at which steel begins to deform plastically.